Before construction, the road surface should be cleaned, oil stains and loose parts should be removed to ensure that the road surface is dry and free of floating dust, and the spraying amount should be determined according to the road surface condition;
The color polymer slurry mixture is two components, the main agent : curing agent=25:1, according to this dosage and specified proportions, the curing agent is poured into the main agent, and the polymer is stirred for 30 seconds; After the slurry mixture is prepared, use it up within 1 hour, otherwise the gel will be scrapped.
Measure the surface temperature, the surface temperature must be lower than 45℃ Construction can not be carried out in rainy days; The color polymer slurry mixture should be stored in a cool place, and it is forbidden to expose to the sun; Carry out the first time of coating and scraping of the color polymer slurry mixture, and after 3 hours of drying, carry out the second time of coating and scraping; Coating parameters: scrape twice the amount: 3.5kg/m2; After the construction is completed, it needs to be maintained for 4-12 hours (depending on the temperature), and then open to traffic;
Construction can not be carried out in rainy days; The color polymer slurry mixture should be stored in a cool place, and it is forbidden to expose to the sun;

Contact Anna via WhatsApp
WeChat for Inquiries
Copyright © Go Green Industrial (Shanghai) Co.,Ltd. All Rights Reserved | Sitemap
Follow us on Wechat